What takes 5 tractors, 200 labor hours, and 1 week to heal????

Answer:  Fairway Topdressing, Aerification and Shockwave

The Process:
Start with 500 tons of sand

Then we apply the sand at 20 tons/acre


The sand is then aerified into the fairway turf using solid tines.


The solid tine aerification is followed with the shockwave shaking the sand into the fairway turf.

The final task is to brush the remaining sand into the fairway turf.

You will find this sign on the holes that we will have to close for this process.  It can take up to 2 hours per fairway to shockwave.  For the safety of the most valued operator employees and efficiency of the process it is necessary for us to close 
the hole.



We know you're going to love the finished product.